GEMS PISTON TYPE FLOW SWITCH, FS-925, 316 S/S, 1/4"NPT, SPDT, 0.5GPM, 24" LONG LEADS
SKU
26928
26928 , GEMS PISTON TYPE FLOW SWITCH, FS-925, 316 S/S, 1/4"NPT, SPDT, 0.5GPM, 24" LONG LEADS
26928 , GEMS PISTON TYPE FLOW SWITCH, FS-925, 316 S/S, 1/4"NPT, SPDT, 0.5GPM, 24" LONG LEADS
Brand | GEMS |
---|---|
Product Name | GEMS PISTON TYPE FLOW SWITCH, FS-925, 316 S/S, 1/4"NPT, SPDT, 0.5GPM, 24" LONG LEADS |
“Bastini” Co. Ltd.
Department of International Supplies
195279, Sankt-Peterburg, shosse Revolyutcii 69,office 27, Russia
Phone: +7(921) 380 77 97
Email: office@bastini.ru